About The Project
Rehabilitation work was being done to the rail crossing outside of Acton, ON at Third Line.
A surveyor was dispatched to site ahead of rehab work to survey the track’s current conditions. Horizontal and vertical alignments were prepared in the office. After work was completed at the crossing, our surveyor worked with PNR staff to ensure the track’s new position was lifted correctly from its original position.
Services Provided
GPS/Total Station
Our field teams use Leica robotic Total Stations, Leica, Trimble, and Topcon GNSS units and Leica DNA03 digital levels to provide a wide range of services for projects of any size; includes topographical surveys, construction layout, control networks, deformation monitoring, site volume calculations, as-built surveys and much more.