Third Line Crossing Rehab

About The Project

Rehabilitation work was being done to the rail crossing outside of Acton, ON at Third Line.

A surveyor was dispatched to site ahead of rehab work to survey the track’s current conditions.  Horizontal and vertical alignments were prepared in the office.  After work was completed at the crossing, our surveyor worked with PNR staff to ensure the track’s new position was lifted correctly from its original position.

Services Provided

  • Get in Touch!

    Groma provides better services, better solutions, and better results for your surveying needs.