About The Project
Survey support during rehabilitation construction of the Kennedy Road crossing in Markham, on Metrolinx’s Uxbridge subdivision.
A surveyor was on site with flagging earlier in the week to survey the existing track conditions. In the office, Groma’s CAD Technician prepared the required layout alignments for use during construction. A surveyor provided survey support during one weekend shift to ensure tracks were put back into the correct position and elevation.
Services Provided
GPS/Total Station
Our field teams use Leica robotic Total Stations, Leica, Trimble, and Topcon GNSS units and Leica DNA03 digital levels to provide a wide range of services for projects of any size; includes topographical surveys, construction layout, control networks, deformation monitoring, site volume calculations, as-built surveys and much more.