Kennedy Road Crossing Rehab

About The Project

Survey support during rehabilitation construction of the Kennedy Road crossing in Markham, on Metrolinx’s Uxbridge subdivision.

A surveyor was on site with flagging earlier in the week to survey the existing track conditions.  In the office, Groma’s CAD Technician prepared the required layout alignments for use during construction.  A surveyor provided survey support during one weekend shift to ensure tracks were put back into the correct position and elevation.

Services Provided

  • Get in Touch!

    Groma provides better services, better solutions, and better results for your surveying needs.

    Search

    Recent Topics

    Menu