Uxbridge 56.00

About The Project

Topographic survey of CP Belleville bridge passing over Metrolinx Uxbridge Subdivision at Mi. 56.00 (Scarborough).

On the CP corridor, surveyors captured top of rail and top of bridge features.  On the Metrolinx corridor below, further structural details were captured on the underside of the bridge (clearances, piers, abutment geometry, etc.) in addition to a full topo survey of ~200m of the corridor.

Though parts of the site were still snowed in following January’s large snow storm, the survey crews were able to dig out and access the required areas to capture survey features.