Bloomington Track Layout

About The Project

Total station construction layout at rail bridge over Bloomington Road (Regional Road 40), west of Highway 404.  Original stakeout items (2016) include the pullback track and shoring wall.  Groma’s field staff also surveyed the existing road island on Bloomington and the new bridge piers.

Groma surveyors have also assisted with track diversions during construction on the bridge in 2017.

Services Provided

  • Get in Touch!

    Groma provides better services, better solutions, and better results for your surveying needs.

    Search

    Recent Topics

    Menu