Downsview Monitoring

About The Project

Track monitoring at 3 locations on the Newmarket Subdivision near Downsview Park.

Beacon completed directional drilling at the 3 sites, which required track monitoring to check for settlement outside of the allowable limit.  Groma installed targets on the web of the rails, and iron bars were installed by Beacon along the corridor and the alignment of the drilling.

Before constructions, baseline readings were taken of all points.  Groma was on site continuously during drilling to monitor the track movement.

Following construction, Groma surveyors monitoring the points one daily for 2 weeks, then twice weekly for one month.  All monitoring reports were sent directly to Beacon.

Services Provided

  • Get in Touch!

    Groma provides better services, better solutions, and better results for your surveying needs.

    Search

    Recent Topics

    Menu