Galt Subdivision Sightline Evaluation

About The Project

CP Rail required all unprotected crossings along the Galt Subdivision to have a sightline evaluation.

To perform these evaluations, Groma needed to provide a 3D pointcloud and orthophoto of the entire rail corridor, 500m from the crossing

In typical week we surveyed ~15 crossings and began submitting the crossings the following week.

Within 1 month, we were able to perform our drone surveys of the 55 crossings requested and have the entire project submitted.

Services Provided

  • Get in Touch!

    Groma provides better services, better solutions, and better results for your surveying needs.

    Search

    Recent Topics

    Menu