Kapuskasing Mi. 125.8 & 126.2

About The Project

Topographic survey of 2 rail bridges outside of Hearst, ON.  Both bridges were surveyed in the winter when snow was present on site.  This limited the survey to track level for safety reasons, but a drone flight was completed to capture the wing walls of each structures.  Work was done with ONR flagging protection.

Services Provided

  • Get in Touch!

    Groma provides better services, better solutions, and better results for your surveying needs.

    Search

    Recent Topics

    Menu