About The Project
Topographic survey at signal bridge at Kingston Mi. 331.20 (Toronto). The client asked for detailed survey at the concrete foundations of the signal bridge, so that it could be replaced in the same position following upcoming construction work. During the same site visit, the survey crew captured additional details at the Gerard & Carlaw street bridges at the steel walkways.
Work was completed during overnight hours with flagging protection provided by Metrolinx.
Services Provided
GPS/Total Station
Our field teams use Leica robotic Total Stations, Leica, Trimble, and Topcon GNSS units and Leica DNA03 digital levels to provide a wide range of services for projects of any size; includes topographical surveys, construction layout, control networks, deformation monitoring, site volume calculations, as-built surveys and much more.