Crossing rehab at Manse Road in Scarborough, on Metrolinx’s Kingston subdivision (Lakeshore East corridor).
Because of the frequency of train traffic, work was split into 2 shifts. The crew surveyed the tracks before work started, and used prepared layout data for survey support during construction. Track panels were replaced on both the north and south tracks over the course of 24 hours.
Services Provided
GPS/Total Station
Our field teams use Leica robotic Total Stations, Leica, Trimble, and Topcon GNSS units and Leica DNA03 digital levels to provide a wide range of services for projects of any size; includes topographical surveys, construction layout, control networks, deformation monitoring, site volume calculations, as-built surveys and much more.