Metrolinx Culverts

About The Project

Over 25 culverts on 5 subdivisions (Newmarket-Barrie, Oakville, Bala, Weston and Uxbridge) were surveyed over approximately 4 months using a combination of GPS and total station.  Surveys covered the culverts as well as topography on the corridor (varying 30-100m each way based on site conditions).  Included on this list were 2 bridges where the tracks pass over a creek.

A combination of total station and GPS was used at each location.  Elevations were matched to vertical control monuments within close proximity to site.

Survey deliverables included CADD survey plans, survey points, and extensive site photos for each culvert or bridge.

Services Provided

  • Get in Touch!

    Groma provides better services, better solutions, and better results for your surveying needs.