Smiths Falls 21.21

About The Project

A survey was required outside of Ottawa, Ontario, at bridge 21.21 on the Smiths Falls Subdivision.  In addition to track-level items at the bridge, the top of rail was surveyed up to 150m either way.

A points list and CADD survey deliverables were prepared for the client, as well as a full bridge analysis.

Services Provided

  • Get in Touch!

    Groma provides better services, better solutions, and better results for your surveying needs.

    Search

    Recent Topics

    Menu