About The Project
Topographic survey of Victoria Park property in Brampton.
Surveys picked up all above-ground features on the property, including the arena, day care, soccer field and parking lot.
The TRCA came to this site in addition to Balmoral to stake out the natural top of bank along the east side of the creek. A surveyor picked up these stake points for inclusion in the final survey deliverables, though these points were submitted early to expedite planning by the City.
SUE Level B utility locates were carried out by a subcontractor. All markings were surveyed
Survey deliverables include a survey point list, CADD base plans and a DTM of the site ground conditions.