Rock Tunnel Clearances

About The Project

We were tasked with determining the clearances inside a rock tunnel. This was required as the client wanted to determine if they could transport larger freight the tunnel.

Since the tunnel has irregular faces and rock protrusions, the best method to accurately survey the tunnel was to scan the inside.

After scanning the tunnel, we were able to model the size of the larger freight against the size of the tunnel, and determine the exact volume of rock that needed to be cut.

Services Provided

  • Get in Touch!

    Groma provides better services, better solutions, and better results for your surveying needs.

    Search

    Recent Topics

    Menu