About The Project
This survey took place outside of Princeton, Ontario, and included the Blenheim Rd. bridge over the CN corridor, as well as the roadway 200m north and south.
Flagging was provided to survey the tracks and underside of the bridge.
Property bars were surveyed based on locations found from First Base Solutions, along Blenheim Road, Oxford Rd 2 and Township Rd 2.
Deliverables included the list of survey points and CADD base files.
Services Provided
GPS/Total Station
Our field teams use Leica robotic Total Stations, Leica, Trimble, and Topcon GNSS units and Leica DNA03 digital levels to provide a wide range of services for projects of any size; includes topographical surveys, construction layout, control networks, deformation monitoring, site volume calculations, as-built surveys and much more.