Dundas 9.1

About The Project

In February, a surveyor was dispatched to site to survey proposed borehole locations, returning again in April to survey the points after boreholes and other pipes had been installed.  Someone from RWDI was on site to show us which measurements and points were needed on the boreholes after installation.

Groma was on this site in 2016 for separate work, but tied into old base and control points which were used to determine the location of the boreholes.

Services Provided

  • Get in Touch!

    Groma provides better services, better solutions, and better results for your surveying needs.

    Search

    Recent Topics

    Menu