Barwick Street

About The Project

Topographic survey of Barwick Street bridge over CN right of way, and the CN rail corridor between Highway 3 & the Paynes/Cayuga Subdivision mainline.  Ground points, banks and other ground features were captured in an aerial LiDAR flight of the site limits.  This data was supplemented by total station surveys of the bridge, track and roadways where higher accuracy was required.

A legal boundary survey was completed by Groma’s OLS subcontractor, requiring coordination with local surveyors to collect records of the adjacent properties and roadways.

Services Provided

  • Get in Touch!

    Groma provides better services, better solutions, and better results for your surveying needs.

    Search

    Recent Topics

    Menu