London Layover

About The Project

Topographic survey of 600m long rail corridor for a CN spur track in London.  Survey captured existing top of rail and rail infrastructure (i.e. signals, switches), ground points and all other features.  Borehole points were marked on site by the client at the time of survey to be a captured as well.

Groma’s legal surveying subcontractor completed a boundary survey of the site limits, to determine the extent of CN’s property for future design considerations.

Services Provided

  • Get in Touch!

    Groma provides better services, better solutions, and better results for your surveying needs.

    Search

    Recent Topics

    Menu