Smiths Falls Bridges

About The Project

This survey comprised of three bridge surveys on the Smiths Falls Subdivision, at mileages 9.26, 21.99 and 29.50.  A full bridge survey was completed for each, as well as a survey of top of rail each way from the backwall.  Points were also taken upstream and downstream through the watercourse.

A 3D laser scan was completed at bridge 9.26, to produce a Recap point cloud.

Services Provided

  • Get in Touch!

    Groma provides better services, better solutions, and better results for your surveying needs.

    Search

    Recent Topics

    Menu