Temagami 119.10

About The Project

Survey of rail bridge at Temagami Mi. 119.10 (Uno Park).  Surveyor captured:

-Top of rail through bridge and 500ft on both approaches
-Top of steel at each span
-Top of concrete backwalls

The client received a CAD survey base plan of the data.

Services Provided

  • Get in Touch!

    Groma provides better services, better solutions, and better results for your surveying needs.

    Search

    Recent Topics

    Menu